LTA Covered linkway
Contribution
-
Architectural construction drafting
-
Authority submission
-
Liaising with different department
The main task of this project was the communication with different authority department and the contractor. Since this project affects different stakeholder, land owner and department, therefore it is very challenging in terms of coordinating with different parties to ensure that these parties requirement are met.
In terms of drafting, I will have to ensure the accuracy of the covered linkway alignment to the surveyor plan from concept drawing, construction drawing and as-built drawing.